Skip to content

Service · Backend

Java Development Services

Engage us for Java work that has to keep running for years: services on the JVM, integrations with ERP, banking or messaging systems, and upgrades of codebases stuck on old Java releases. We deliver the code, the build and the operating notes.

Current LTS JDK targets

Reproducible Maven or Gradle builds

Kafka, JMS and file-based integrations

Deliverables

What a Java development engagement delivers.

01Delivered

JVM services

Back-end services on a current LTS JDK, built with whichever framework suits the job: Spring, Quarkus, Micronaut or Jakarta EE.

02Delivered

Enterprise integrations

Connectors to SOAP and REST partners, Kafka, IBM MQ or ActiveMQ, SFTP drops and fixed-width batch files, with retries and reconciliation reports.

03Delivered

Batch processing

Scheduled, chunked jobs for statements, imports and settlements that restart from the last committed chunk after a failure.

04Delivered

JDK upgrade

Code moved from Java 8 or 11 to a current LTS, with removed APIs replaced, libraries updated and the javax-to-jakarta rename handled where it applies.

05Delivered

Reproducible build

Maven or Gradle with locked dependency versions, static analysis, test reports and container images built by Jib or a Dockerfile.

Early decisions

Technical decisions we settle early in Java development.

01Decided

Framework

Spring Boot for breadth, Quarkus or Micronaut for fast start-up and small footprints, or Jakarta EE where an application server is already standard.

02Decided

JDK vendor and release

Which LTS release and which distribution, based on your support contract and platform.

03Decided

Virtual threads

Whether Java 21 virtual threads let blocking I/O code stay simple instead of moving to a reactive style.

04Decided

Delivery semantics

At-least-once consumption with idempotent handlers, or a transactional outbox where duplicates are unacceptable.

05Decided

Heap and collector

Garbage collector and memory settings sized for container limits rather than left at JVM defaults.

Engagement

How a Java development engagement runs.

  1. 01Phase 1

    System and interface inventory

    We list every upstream and downstream system with its protocol, data format and failure behaviour, since integration risk sits there.

  2. 02Phase 2

    Build and baseline

    The project moves onto a reproducible build with tests running in CI before any functional change is attempted.

  3. 03Phase 3

    Deliver in integration slices

    Each slice connects one external system end to end, tested against stubs first and then the partner’s own test environment.

  4. 04Phase 4

    Volume run and operational handover

    We push realistic volumes through, tune JVM flags for the container, and hand over a runbook for every integration.

Fit

When Java is the right choice.

01Good fit

Systems meant to last

Software expected to run and be maintained for a long time by changing teams and suppliers.

02Good fit

Integration-heavy back ends

Services connecting to banks, ERPs, logistics partners and older messaging infrastructure.

03Good fit

An established JVM estate

Organisations that already have Java skills, monitoring and deployment tooling in place.

Integration is where Java projects succeed or fail

The code inside a Java service is rarely the hardest part. The hard part is the partner whose test environment is down, the file that arrives twice, or the broker that redelivers after a timeout. We design every integration for those cases from the outset: idempotent handling, reconciliation reports and clear alerts.

Upgrading old JDKs safely

Codebases on Java 8 often lean on APIs removed in later releases, on libraries that no longer receive fixes, and on the javax namespace that Jakarta EE renamed. We take the upgrade in stages with the build green at every step, so production never runs a half-migrated mix.

The JVM inside containers

Modern JVMs respect container memory limits, yet default heap ratios and collector choices may still not suit the service. We set them explicitly, measure start-up and memory, and consider class data sharing or native images where start-up time matters.

What the handover contains

You receive the code and build, a register of every integration with its contacts and failure handling, and dashboards for JVM health such as heap use, GC pauses and thread counts.

FAQ

Questions to resolve before the build.

01Can you upgrade us from Java 8?

Yes. We usually step through an intermediate LTS release before the latest one, fixing removed APIs, illegal reflective access and outdated libraries at each stage. A reproducible build and tests come first.

02Do you only use Spring?

No. Spring Boot is common, but Quarkus, Micronaut and Jakarta EE suit some cases better, such as fast-starting containers or an existing application-server estate.

03Should we adopt virtual threads?

If your service mostly waits on I/O and runs on Java 21 or later, virtual threads can keep code straightforward where it would otherwise need a reactive style. We check libraries for thread-pinning issues first.

04Can you integrate with our legacy message broker?

Usually, yes. JMS-compatible brokers and Kafka are well supported in Java, and we design consumers to cope safely with redelivery and messages arriving out of order.

Primary sources

References behind this page

Dated official documentation, standards, and research that support the factual claims on this page.

  1. 01
  2. 02

How to read this page

Scope, cost and timeline figures are planning guidance until confirmed in a written proposal. Diagrams and screens are illustrations, not client deliverables, and source-code rights and handover follow the signed agreement. See the delivery process and the full disclaimer.

Next decision

Turn the brief into an accepted product scope.

Define outcomes, constraints, evidence, rights and handover before delivery begins.

Commercial rights, repositories, environments, documentation, acceptance and handover remain contract-defined.