Skip to content

Service · Cloud

Cloud Engineering Services

Commission us to build the platform foundations your applications will run on: account or subscription hierarchy, network topology, infrastructure modules and cost controls. The result is a governed estate that product teams can deploy into without reinventing the basics.

Landing zone designed before workloads

Reusable Terraform modules with checks

Tag policy and budgets enforced

Deliverables

What a cloud engineering engagement delivers.

01Delivered

Landing zone

An account, subscription or project hierarchy with environments separated, guardrail policies applied at the top and a vending process for new workloads.

02Delivered

Network topology

Hub-and-spoke or shared VPC design, an address plan that avoids clashes with offices and partners, private connectivity, egress controls and cross-environment DNS.

03Delivered

Infrastructure modules

Versioned Terraform or OpenTofu modules for common building blocks, with input validation, examples and automated plan checks in the pipeline.

04Delivered

Engineer access through your identity provider

Single sign-on into every cloud account, role-based permission sets and monitored break-glass accounts for emergencies.

05Delivered

Cost governance

Mandatory tagging, budgets per team, anomaly alerts and a monthly report showing spend by product, so cost conversations start from data.

Early decisions

Technical decisions we settle early in cloud engineering.

01Decided

One provider or several

Most organisations are best served by one primary provider. We support a second only when a contract, regulation or specific service demands it, and state what it costs to govern.

02Decided

Module granularity

Modules small enough to compose yet large enough to encode a judgement, such as a private database with backups and alerts rather than a thin wrapper over one resource.

03Decided

State management

Where Terraform state lives, how it is locked and encrypted, and how it is split so one team’s change cannot block another’s pipeline.

04Decided

Address planning

CIDR ranges allocated for growth, peering and on-premises links before the first network exists, since readdressing later forces rebuilds.

05Decided

Guardrails versus reviews

Which rules policy enforces automatically, such as blocking public storage, and which are left to code review, so teams are not slowed by manual gates.

Engagement

How a cloud engineering engagement runs.

  1. 01Phase 1

    Estate discovery

    We inventory existing accounts, networks, pipelines and spend, and interview teams about how they deploy today and where they get stuck.

  2. 02Phase 2

    Design sign-off

    A written design for hierarchy, networking, identity and tagging is reviewed with your security, finance and engineering leads before anything is built.

  3. 03Phase 3

    Build and pilot workload

    We build the landing zone and modules, then onboard one real workload through it to prove the path and expose gaps.

  4. 04Phase 4

    Golden path and adoption

    Your teams receive module documentation, a template for new services and paired sessions while they bring their own workloads across.

Fit

When provider-neutral cloud engineering is the right choice.

01Good fit

Several teams deploy with no shared rules

Inconsistent networks, untagged resources and ad-hoc access are signs the estate needs a common foundation.

02Good fit

Cloud usage is about to grow

Putting structure in place before dozens of workloads arrive costs far less than retrofitting it afterwards.

03Good fit

Finance cannot attribute the bill

When spend cannot be traced to products or teams, tagging and account structure are the fix.

Foundations before workloads

Cloud estates often grow one project at a time, each with its own network, naming and access model. Eventually nobody can say which resources belong to which product or who may change them.

A landing zone sets the hierarchy, policies and shared services first, so every new workload arrives into a known structure.

Modules that carry decisions

A useful infrastructure module captures a judgement, such as how a production database should be backed up, encrypted and monitored. Teams consuming it inherit that judgement without rediscovering it. We version modules, test them with plan checks and publish change notes so upgrades are deliberate.

Network design that survives growth

Address ranges that overlap with an office or a partner’s VPN can block connectivity years later. We plan space for expected environments, regions and acquisitions, and design hub networks for inspection and shared egress so new spokes attach without readdressing.

Cost as an engineering signal

When each resource carries owner and product tags, cost becomes something engineers can see and act on. We route budgets and anomaly alerts to the owning team rather than a central inbox, and review rightsizing and commitment options with finance.

FAQ

Questions to resolve before the build.

01Do you use AWS Control Tower or Azure landing zone accelerators?

Where they fit, yes. Control Tower, the Azure landing zone reference implementation and Google Cloud’s foundation blueprints save effort; we adapt them to your needs instead of rebuilding the same thing by hand.

02Why Terraform rather than each provider’s own tool?

Terraform or OpenTofu covers several providers plus DNS, monitoring and identity platforms in one language. If you are firmly on one cloud and prefer CDK or Bicep, we can work in those instead.

03How do you stop teams bypassing the foundation?

Organisation-level policies block the riskiest actions outright, and the golden-path templates make the governed route the fastest one for teams to take.

04What happens to workloads that already exist?

We map them against the new structure and propose an order for bringing them in, starting with those carrying the most risk or spend.

Primary sources

References behind this page

Dated official documentation, standards, and research that support the factual claims on this page.

  1. 01
  2. 02

How to read this page

Scope, cost and timeline figures are planning guidance until confirmed in a written proposal. Diagrams and screens are illustrations, not client deliverables, and source-code rights and handover follow the signed agreement. See the delivery process and the full disclaimer.

Next decision

Turn the brief into an accepted product scope.

Define outcomes, constraints, evidence, rights and handover before delivery begins.

Commercial rights, repositories, environments, documentation, acceptance and handover remain contract-defined.