Skip to content

Service · Cloud

DevOps Services

Commission us to fix how your software travels from a merged pull request to production: build pipelines, test gates, deployment strategies and the monitoring that tells you a release misbehaved. You end up shipping more often, with fewer incidents caused by changes.

Pipelines defined in the repository

Canary or blue-green releases

Alerts tied to service-level objectives

Deliverables

What a DevOps engagement delivers.

01Delivered

CI pipelines

Build, test, lint and security scanning on every pull request in GitHub Actions, GitLab CI or Azure Pipelines, with caching that keeps feedback quick.

02Delivered

Deployment automation

Promotion from staging to production through one pipeline, with artefacts built once and deployed many times.

03Delivered

Release safety controls

Canary or blue-green deployments, feature flags for risky changes and automatic rollback when error rates or latency cross thresholds.

04Delivered

Observability

Metrics, logs and traces collected through OpenTelemetry into your chosen backend, with service-level objectives and alerts based on user impact.

05Delivered

Delivery metrics

Deployment frequency, lead time for changes, change failure rate and time to restore, measured from pipeline and incident data.

Early decisions

Technical decisions we settle early in DevOps.

01Decided

Branching model

Trunk-based development with short-lived branches in most cases, because long-lived release branches delay integration and hide conflicts.

02Decided

Deployment strategy per service

Rolling, blue-green or canary, chosen by how much traffic a service carries and how quickly a bad release would cause harm.

03Decided

Which tests gate what

Which suites block a merge, which run after deployment and how flaky tests are quarantined rather than ignored.

04Decided

Pipeline credentials

OIDC federation to cloud providers instead of stored keys, and scoped tokens for each pipeline stage.

05Decided

Alerting philosophy

Pages for symptoms users feel, such as errors and latency against objectives, rather than for every CPU spike.

Engagement

How a DevOps engagement runs.

  1. 01Phase 1

    Delivery audit

    We trace a recent change from commit to production, timing each step and noting manual handoffs, flaky tests and approval queues.

  2. 02Phase 2

    Pipeline rebuild

    The new pipeline is written as code and runs in parallel with the old one, and we switch only once it has earned trust.

  3. 03Phase 3

    Progressive delivery rollout

    Canary or blue-green releases and automatic rollback are introduced service by service, starting with the one deployed most often.

  4. 04Phase 4

    Objectives, drills and handover

    Service-level objectives, dashboards and on-call runbooks are agreed with your team, and we run incident drills before stepping back.

Fit

When a DevOps engagement is the right choice.

01Good fit

Releases are rare and stressful

Monthly release nights full of manual steps signal that the pipeline, not the team, is the bottleneck.

02Good fit

Changes keep causing incidents

A high change failure rate points to missing test gates, missing rollback or deployments that bundle too much.

03Good fit

Nobody can see what production is doing

Without traces and meaningful alerts, customers find problems before engineers do.

Small changes are safer changes

A release containing three weeks of work is hard to test and harder to roll back. Pipelines that make deploying cheap encourage small, frequent changes that are each easy to reason about, which is the biggest single lever on change failure rate.

Build once, promote everywhere

Rebuilding an artefact per environment means production may run something staging never saw. We build an image or package once, sign it and promote that exact artefact through every stage.

Letting metrics trigger rollback

Canary releases send a slice of traffic to the new version and compare its behaviour with the current one. Argo Rollouts, Flagger or a provider’s native deployment features can then reverse the release automatically when the comparison fails.

Alerts people trust

An on-call rota that receives dozens of noisy pages learns to ignore them. We define objectives with your product owners and alert on error-budget burn, so a page means users are genuinely affected.

FAQ

Questions to resolve before the build.

01Do we have to change CI tools?

Not usually. We work with GitHub Actions, GitLab CI, Azure Pipelines, Jenkins or CircleCI, and only suggest a switch when the current tool blocks something important such as OIDC federation.

02How does automated rollback decide a release is bad?

During a canary window we compare error rate and latency for the new version against the old one. If the new version breaches thresholds you agreed, traffic shifts back without anyone being woken to decide.

03Will more gates slow developers down?

The aim is the reverse. Fast, reliable checks on each pull request replace slow manual approvals at release time, so changes reach production sooner.

04How do you show improvement?

We take baseline DORA metrics from your pipeline and incident history at the start and report the same measures at handover.

Primary sources

References behind this page

Dated official documentation, standards, and research that support the factual claims on this page.

  1. 01
  2. 02

How to read this page

Scope, cost and timeline figures are planning guidance until confirmed in a written proposal. Diagrams and screens are illustrations, not client deliverables, and source-code rights and handover follow the signed agreement. See the delivery process and the full disclaimer.

Next decision

Turn the brief into an accepted product scope.

Define outcomes, constraints, evidence, rights and handover before delivery begins.

Commercial rights, repositories, environments, documentation, acceptance and handover remain contract-defined.